According to quikrete s online calculator the amount of concrete needed for a 10 by 10 foot slab depends on the thickness of the slab.
Make a 10x10 concrete slab.
This calculator is to be used as an estimating tool only.
Please enter length in foot.
The recommended thickness of your shed s slab is 4 deep.
We go over all the necessary steps for your concrete slab to come out perfect.
Please enter length in inches.
Cost of concrete slab for shed.
Unfortunately a slab this size only requires about one cubic yard of concrete.
The air entrainment traps microscopic bubbles that help concrete withstand freezing temperatures.
In this video we show you how to pour your basic 16 x 12 concrete slab.
For a 4 inch slab either eight 60 pound or six 80 pound bags are required while for a 6 inch slab either 12 60 pound or nine 80 pound bags are necessary.
In order to get all the needed concrete ready to pour at once people often call for a concrete delivery from a ready mix company.
The concrete slabs estimator will provide you with up to date pricing for your area.
A 10 x 10 area 100 square feet.
For a large slab like ours that may have occasional vehicle traffic we ordered a 3 500 lb.
Place 1 2 inch reinforcing bar or rebar around the perimeter of the slab to help the concrete slab adjust to temperature extremes without cracking.
The cost of a 10x10 concrete slab for a shed ranges from 670 to 930 while a 20x20 slab runs around 2 690.
Use 10 by 10 welded wire mesh inside the area.
The following prices include materials and professional installation for a 4 deep slab.
Simply enter your zip code and the square footage next click update and you will see a breakdown on what it should cost to have concrete slabs installed at your home.
Mix with five percent air entrainment.
Click the button to calculate the volume of concrete and man hours not including mixing needed for this job.
Triple check your concrete forms to make sure they re square level straight and well braced.
Ready mix concrete trucks the big concrete trucks that deliver concrete and spin usually have a three yard minimum order.
A typical pad has a 4 inch layer of gravel underneath and about 4 inches of concrete on top.